|
Thermal Insulation |
|
|
|
|
|
A complete
refrigerator icebox rebuild |
|
|
Installing the hatch frames and countertop |
|
| Photo #8 of 13 | |
![]() |
The top insulation is installed under a 3/4" marine plywood countertop base. Glacier Bay's "Ready-To-Mount" hatch frames are mounted in place (two over the refrigerator and one over the freezer) as is the galley sink |
| Photo #9 of 13 | |
![]() |
A Glacier Bay "Ready-To-Mount" hatch frame (large) is surface mounted at the front of the refrigerator box to make a front-opening door. |
| Photo #10 of 13 | |
![]() |
The countertop is finished off in white Corian and the front-opening hatch frame is trimmed in teak. |
| Continue Photographic Tour | |
|
>>> |
|
| Return to Home page | |
| . | |
![]() |
|