GLACIER BAY, INC.
 

SYSTEM STARTUP FORM

 

This form must be completed in its entirety and submitted at the time of system startup to validate the warranty.

 

System Information

Owner Information

Startup Date:

Owner's name:

Model #: Street address:
Serial #: City/State/Zip:
Manufacture Date: Country:

Vessel Information

Number of Refrigerator zones:

Boat make:

Number of Freezer zones: Model:
Number of Arctic Air zones: Hull number:

Service Agent Information

Controls (indicate number and type of each)

Company:

Refrigerator: ECM STD Service technician:
Freezer: ECM STD Contact number:
Arctic Air: TIMER DIG Work performed at (location)
Technician Certification Number#
 

Prestart Checkout

Instructions: Locate, verify and check off each item. A description of each can be found in the Installation Manual.

 

Compressor mounted on non-resonating platform Yes No
R/A/D Assembly is mounted upright (vertical) Yes No
Suction line (in/out) on R/A/D Assembly is routed correctly Yes No
Condenser is mounted upright (vertical) Yes No
All joints made with Stay-Brite #8 low-temp solder Yes No
No non-factory flare connections Yes No
No bends in VBI's Yes No
No "oil traps" at suction "tee" connections Yes No
All 3/8" liquid lines are the same length running to each "zone" Yes No
H-P cut-out Rotolock valve in "service" position Yes No
All other Rotolock valves are fully open Yes No
Plate temperature probes properly positioned and secured Yes No
Box temperature probes properly positioned and secured Yes No
All TXV sensing bulbs at 10:00 to 2:00 position and horizontal Yes No
All TXV sensing bulbs tightly clamped with metal straps Yes No
All TXV sensing bulbs sensing gas flow from correct plate only Yes No
Centrifugal pump is positioned to be self-priming Yes No N/A
Positive displacement pump...... N/A

...has water pre-filter

Yes No

...mounted on non-resonating platform

Yes No
Condenser water flow enters at bottom and discharges at top Yes No
Condenser bonding stud connected Yes No
Water inlet and discharge thru-hulls are open Yes No
All wire control box connections are tinned and tight Yes No
Correct circuit breaker is installed Yes No
Appropriate wire sizes are used Yes No

Charge / Startup

All tests are made using the following units of measurement  Temperature
Pressure
Weight
The ambient temperatures at the time of service  Air  Water

 

Leak Test
Pressurizing Agent (check all that apply)  R-134a R-22 Nitrogen Other
Equipment used (check all that apply) Electronic sniffer
Ultrasonic detector
Soap bubbles
Other
Initial Pressure Ending Pressure Total Time (Hrs)

 

System Evacuation

Total Pump Runtime (Hrs)
Ultimate Pressure

 

Refrigerant Charge

Total Weight

 

Superheat Settings - Freezer

BOX 1

BOX 2

Plate 1 Plate 2 Plate 3 Plate 1 Plate 2
Pressure Drop
Evaporator Exit Temp.
Suction Pressure
Superheat

 

Superheat Settings - Refrigerator

BOX 1 BOX 2 BOX 3
Plate 1 Plate 2 Plate 1 Plate 2 Plate 1
Pressure Drop
Evaporator Exit Temp.
Suction Pressure
Superheat

 

Pressure Readings (after final superheat adjustment)

Freezer high side Holding plate surface temp. Pressure
Freezer low side Pressure
Refrigerator high side Holding plate surface temp. Pressure
Refrigerator low side Pressure
 

Compressor Motor Current

Current draw (amps) Low side pressure

 

Control Settings (P2 and ST2 for ECM controls only)

BOX 1 BOX 2 BOX 3
P1 P2 ST1 ST2 P1 P2 ST1 ST2 P1 P2 ST1 ST2
Refrigerator
Freezer

 

Refrigerator and Freezer box pull down sequentially (freezer has priority) Yes   No

 

Arctic Air Option Only

High Side Pressure (after final CPR setting - all blowers on)
Low Side Pressure (after final CPR setting - all blowers on)
Compressor Motor Current Draw - Amps (after final CPR setting - all blowers on)
Blower 1 Blower 2 Blower 3 Blower 4 Blower 5
Inlet Air Temp. (one zone only)
Discharge Air Temp. (one zone only)

Return to Home page.